Monthly Archives: March 2022

  1. Connecting C76 with VFD Alarm

    C76 VFD Alarm Wiring

    Read more »
  2. Connecting C82 with VFD Alarm

    Connecting C82 - Dual Port Multifunction Board with VFD Alarm

    Read more »
  3. Mach4 Ethernet Smooth Stepper with Plasma Touch Sensor Configuration v2

     

     

    Mach4 Ethernet Smooth Stepper with Plasma Touch Sensor Configuration.

     

    Read more »
  4. C76 Huanyang VFD Setup

     

     

    Recommendations:

    • The configuration you did on the initial Step by Step instructions for Mach3 or Mach4 configured the control software and
    Read more »
  5. C82 Huanyang VFD Setup

    Wiring sample of the C82 board connection with Huanyang VFD

     

    RECOMMENDATIONS:

    • The configuration you did on the initial Step by Step instructions for Mach3 or Mach4 configured the control software and plugin, you just need to set the max spindle speed.
    • Keep in mind that you need to configure the VFD to take the control signals through the terminals:
      • COMMAND VALUE DESCRIPTION
        PD001 1
    Read more »
  6. Connection C76 with Powermax 65/85

    Connection C76 with THC-1 and PTS-1

    Read more »
  7. Connecting C94 Rev.2 with CleartPath

    Connecting C94 Rev.2 with CleartPath

    Read more »
  8. Mach4 and Ethernet Smooth Stepper with Plasma Torch Height Control Configuration v2

    Mach4 and Ethernet Smooth Stepper with Plasma Torch Height Control Configuration

    Read more »
© 2017 CNC4PC. All Rights Reserved.