Initial Step-by-Step Wiring and Testing of a C94 with UCCNC
The main objectives of these step-by-step instructions are:
- Power the Board and e-stop, and test that the board activates/deactivates at the hardware level only with e-stop.
- Install the UCCNC license and configure the pinout and functions of UCCNC supported by the C94. Then, test that UCCNC is communicating with the C94 successfully.
- Enable and configure the Safety Charge Pump to make sure the C94 activates (green LED) when UCCNC becomes active (out of reset).
Software: UCCNC V 1.2115
https://www.cncdrive.com/UCCNC/setup_1.2115.exe
STEP 1: Connect an E-Stop button to short the E-Stop terminals.
- This should give you a green LED while the board is powered and the e-stop is closed.
- If not, check other possible fault conditions and make sure they are not active.

STEP 2: Make sure the controller is connected to an Ethernet port on the PC and powered with LEDs ON.

STEP 3: The UCCNC license must be installed to establish the connection with the hardware. Replace the demo license that comes with the UCCNC installation with the license that you purchased.
STEP 4: Download and run the UC Utilityxxx program to establish the connection, set a fixed IP on the PCβs LAN card, and whitelist the device on the network. You may need to manually configure the LANβs IPv4 protocol to use a fixed IP.
http://cncdrive.com/MC/UC400ETH%20files%20for%20manual%20installation/Plugin/UCxxx_utility.zip
STEP 5: Configure UCCNC manually using these instructions:
https://www.cnc4pc.com/blog/post/UCCNC-with_UC300ETH_basic_configuration_for_c76_or_c94
You can also download and install the cnc4pc.com software to configure UCCNC. This software will configure all the pinouts and functions supported by the C94.
https://cnc4pc2.s3.us-east-2.amazonaws.com/files/UCCNC-C94-5XSD_V1..zip
Select the profile of your preference, then click on 'Install'.

Finally, click on Close.
STEP 6: Start UCCNC, and it should show that it is licensed and should talk ok to the UC300ETH installed in the C94.

STEP 7: Final Test
- Test the E-Stop by opening the circuit and confirming the green LED goes off.
- You can now enable the SCHP back on by moving (JUMPER=ON), so it will be the control software that will enable the system.